Hi, i have moved into my 1902 terraced house. Its a 2 up 2 down, so each room was originally 4m x 4m.
The kitchen remains that size, and it has a slope of 3" over a 4m span.
It is a concrete floor.
I will rip out the kitchen and take up the finished floor to expose the sub floor for the builders, so it will be a blank canvas for them to work from.
How much can you expect me to pay for labour and materials to level this kitchen floor? (16 square metres)