Outside our back door we have a concrete slab (around 7 inches thick) that used to be the base for a lean to greenhouse I want to extend this by a one to two feet so that it can then be used to support a PVC conservatory
I have been told that no matter how well I prepare the extra base there is bound to be some minor settlement along the join between old and new bases which could for instance cause any tiles laid across the gap to crack in time to come Should I be concerned about this and if so could I just not wait a while before tiling
Many thanks
I have been told that no matter how well I prepare the extra base there is bound to be some minor settlement along the join between old and new bases which could for instance cause any tiles laid across the gap to crack in time to come Should I be concerned about this and if so could I just not wait a while before tiling