Hi,
Ive done a quick search and think Ive found the answer to this, but i just want to make sure.
I am replacing a non timed extractor with a timed extractor in the bathroom.
At the moment the fan is switched on via a pull switch that does not do the lighting.
Can i replace the twin and earth from the switch to the extractor with 3 core and earth instead or could i use the earth on the existing cable which is not required on the new fan?
Thanks in advance.
mark
Ive done a quick search and think Ive found the answer to this, but i just want to make sure.
I am replacing a non timed extractor with a timed extractor in the bathroom.
At the moment the fan is switched on via a pull switch that does not do the lighting.
Can i replace the twin and earth from the switch to the extractor with 3 core and earth instead or could i use the earth on the existing cable which is not required on the new fan?
Thanks in advance.
mark