I’ve had a builder round to look at digging out some sleepers (Approx 9 long) along the back of my garden. He quoted 3 days work at £1200, £250 for a skip plus cost of materials. At this sort of price I can’t afford it and will need to do it myself I think.
Other than a lot of hard work and digging, any advice on how to do the job please?
The old sleepers are pretty much disintegrated and are at level with the ground. The soil is incredibly sandy so I’m not worried about drainage etc.
Other than a lot of hard work and digging, any advice on how to do the job please?
The old sleepers are pretty much disintegrated and are at level with the ground. The soil is incredibly sandy so I’m not worried about drainage etc.