Hi
Had a loft conversion company in to modify an existing conversion in a dormer bungalow. All gone well apart from where a new door was cut in to provide eaves access as the original opening had been closed off.
Since the new opening was made, the floor in front of the opening has bowed up. The cupboard door to the right no longer has clearance to the floor to open, so at a guess we are talking a small amount perhaps 5-10mm.
Loft company says nothing to worry about as there changes were not structural. I beg to differ because the headers supporting the roof (horizontal at header and footer of door) were cut. The floor bowing also says otherwise.
Should I be concerned?
Thanks
Mike
Had a loft conversion company in to modify an existing conversion in a dormer bungalow. All gone well apart from where a new door was cut in to provide eaves access as the original opening had been closed off.
Since the new opening was made, the floor in front of the opening has bowed up. The cupboard door to the right no longer has clearance to the floor to open, so at a guess we are talking a small amount perhaps 5-10mm.
Loft company says nothing to worry about as there changes were not structural. I beg to differ because the headers supporting the roof (horizontal at header and footer of door) were cut. The floor bowing also says otherwise.
Should I be concerned?
Thanks
Mike