Hi
I have read some other posts on this forum that suggest a 4 parts of sand to 1 part on cement for a 50mm floor screed, is the mix the same for thicker screeds? say 85mm.
Also is there a formula to work out how much sand would be required?
TIA
Martin
I have read some other posts on this forum that suggest a 4 parts of sand to 1 part on cement for a 50mm floor screed, is the mix the same for thicker screeds? say 85mm.
Also is there a formula to work out how much sand would be required?
TIA
Martin