There is a Connection on the pcb (RP) which is to link external contols to.
If i put in a link to get boiler on it starts off at 9kw them modulates down as its got a 6 stage system!
But when i link the external controls issued by the electric heating company the boiler goes to 24kw, which it shouldt obviosly
Controls EHC Select 107XL
Room stat: tlx 401
These are Sunvic controls and in the installation ins. it gives wiring diagram, which ive done by the book.
Ive bought a second boiler off E-Bay and used Salus prog and this is same.
Elec.heat.co. are getting back to me but ive had **** off them b4
Anyones help most grateful ,as i want the job finished and rapped up!
If i put in a link to get boiler on it starts off at 9kw them modulates down as its got a 6 stage system!
But when i link the external controls issued by the electric heating company the boiler goes to 24kw, which it shouldt obviosly
Controls EHC Select 107XL
Room stat: tlx 401
These are Sunvic controls and in the installation ins. it gives wiring diagram, which ive done by the book.
Ive bought a second boiler off E-Bay and used Salus prog and this is same.
Elec.heat.co. are getting back to me but ive had **** off them b4
Anyones help most grateful ,as i want the job finished and rapped up!