Obviously the BG method of recording efficiency is based on the number of visits rather than the number of faults fixed so its better for the engineer to fix the second fault on another day. Thats not efficient for BG though.
bg record 1st complete on safety checks and breakdowns. you are worse of going back to do second fault on the second day as it still only counts for 1 job visit. im far better off taking longer and fixing the 2 faults rather than 2 lots of driving to and from the job and setting up twice.
like any big company we are spoiled by the few rather than many. the problem is good news is no news and we make a fantastic target.
