Greenstar 24i system boiler demand wiring - no separte live

Joined
1 Mar 2009
Messages
2
Reaction score
0
Location
London
Country
United Kingdom
read thread on this and wanted to confirm that timer should not be feeding a Greenstar 24I but getting its power from the internal distribution ports in the boiler?

Lr and ls terminals have been bridged, so the live feed also generates all demand - so a restart occurs every time demand is created (and power fed to boiler).
 
Sponsored Links
If using exrernal controls, unbridge then send switched live to Lr
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top