read thread on this and wanted to confirm that timer should not be feeding a Greenstar 24I but getting its power from the internal distribution ports in the boiler?
Lr and ls terminals have been bridged, so the live feed also generates all demand - so a restart occurs every time demand is created (and power fed to boiler).
Lr and ls terminals have been bridged, so the live feed also generates all demand - so a restart occurs every time demand is created (and power fed to boiler).