Thanks for the replies.
The existing gas supply is bonded within around 40cm of the meter onto the iron pipework leading from the meter, the new copper is not yet connected but once it is I will need to reposition the bond clamp as they intend a tee within 50cm of the meter so I will need to get the clamp on before that tee.
The boiler was sited in the porch because I really didnt fancy it in the loft where all plumbers seem to want to put them and the kitchen is so small I wanted to get rid of the floor standing potterton and gain some space.
I elected to remove the original high ceiling in the porch so they could run all the pipework on the underside of the joists, the idea being to put a ceiling back lowered on timbers to give clearance to all the pipework hidden behind.
The house has so far had 2 central heating systems and each had cut slots in the joists, so much so that I really wanted to keep the joist cutting to a bare minimum for this install.
The regs on joist cutting dont seem to apply to these plumbers, I found plenty of fresh cuts in areas not in permitted zones.
I had a data cable I wanted to pass under the porch joists so tucked it as close as I could to the edge to give them lots of room for the pipework but they still managed to touch the cable which will do it no good long term.
View media item 3738
I had 2 off 2.5mm twin&earths that I needed to go across also so I tucked them as close as possible to the other edge of the visible joists, blow me if they didnt tuck the gas main pipe right up against them!
View media item 3737
Here's the flue, no condensate pipe fitted yet, and some boiler pics.
View media item 3734 View media item 3736 View media item 3739
I also found some of the wiring had been compromised by the heating pipe install, 2 lighting cables had the heating pipe resting on them in mid joist space, I managed to re route them out of the way but this 2.5mm cable is part of the upstairs ring main and I think they ought to build a noggin bridge to keep thie pipes off it as thats just plain wrong like that.
View media item 3740
Take no notice of the 1.5mm cable above the pipes, thats one I moved and it just needs clipping tomorrow, ran out of time tonight.