hello, we recently changed the flat alsphalt roof with GRP system. the builder used OSB 3 but not T and G. He also did not apply bandage inbetween the joints. However, he applied two times resin on top of laminate/mat and three times topcoat (he sanded every time he applied the coat). will it cause any problems in the future. what better to be done in order to prevent any problems?