Hi, planning a new ensuite as per diagram and would be grateful for some suggestions/advice.
The main problem I think I have is the distance of the shower from the soil stack as it measures approx 6.5 meters (running around the room) just to the new WC. You can’t see in the diagram but there is a cloakroom on the ground floor under the existing bathroom which has a full height false wall which the soil stack is in. I planned to run the new WC waste pipe down at a steepish angle as soon as it goes under the dividing wall between the bathroom and ensuite and connect to the stack lower down than the existing bathroom WC within the false wall with a swept T.
So the questions are:
1) Can I join the 2 basin wastes together to run as 1 and in 32mm?
2) Can I run the basin wastes inside the partition wall and connect to the WC waste at the 1st bend on the WC? If so would I use a boss and would that bend need an access point as well?
3) Can I run and connect the bath waste to the 2nd bend from the WC? As above would it be with a boss and would I need an access point there too?
4) Can I run and connect the shower waste to the bath waste so that I only have one waste pipe from the bath onwards in 50mm?
I know that the situation isn’t ideal but I would like some solutions/suggestions that are within building regulations or close enough that they get passed if possible.
Many thanks.

The main problem I think I have is the distance of the shower from the soil stack as it measures approx 6.5 meters (running around the room) just to the new WC. You can’t see in the diagram but there is a cloakroom on the ground floor under the existing bathroom which has a full height false wall which the soil stack is in. I planned to run the new WC waste pipe down at a steepish angle as soon as it goes under the dividing wall between the bathroom and ensuite and connect to the stack lower down than the existing bathroom WC within the false wall with a swept T.
So the questions are:
1) Can I join the 2 basin wastes together to run as 1 and in 32mm?
2) Can I run the basin wastes inside the partition wall and connect to the WC waste at the 1st bend on the WC? If so would I use a boss and would that bend need an access point as well?
3) Can I run and connect the bath waste to the 2nd bend from the WC? As above would it be with a boss and would I need an access point there too?
4) Can I run and connect the shower waste to the bath waste so that I only have one waste pipe from the bath onwards in 50mm?
I know that the situation isn’t ideal but I would like some solutions/suggestions that are within building regulations or close enough that they get passed if possible.
Many thanks.