An old house, bathroom walls: masonry and studding, leaning sloping bulging - the idea is to tile all walls. Figure i will dot and board, never having done it before( i can plaster, but speed speed).
Nightmare two days later sticking p/b on taking p/b off, bulges and leaning create 3-4 inch make-up's. By the time i had reached the first door casing the p/b was 2 ins diminishing to 1 inch proud, the window reveals likewise - i was so grateful to have plumbed across the window frame that i forgot to measure the reveals.
Now it's plumb and level but looking mighty weird.
Make me weep. How would you have gone about it?
Nightmare two days later sticking p/b on taking p/b off, bulges and leaning create 3-4 inch make-up's. By the time i had reached the first door casing the p/b was 2 ins diminishing to 1 inch proud, the window reveals likewise - i was so grateful to have plumbed across the window frame that i forgot to measure the reveals.
Now it's plumb and level but looking mighty weird.
Make me weep. How would you have gone about it?