how long before tiling?

Joined
23 Feb 2007
Messages
4,767
Reaction score
782
Location
Belfast
Country
United Kingdom
I am about to rip off tiles in a fully tiled bathroom and will be only part tiling the walls when I re-do it. As a result i'm expecting to have to skim the walls once i take gouges out etc with a bolster.

I'm just trying to work out a bt of a schedule and was wondering could someone guesstimate how long would i need to leave between skim coat and Re-tiling?

Oh, any advice on how to get the remaining tile adhesive off neatly?

Cheers.
 
Sponsored Links
Hi,
i always use a sds drill with a chisel bit to remove adhesive and wait 4 weeks before i tile on new plaster :mrgreen:
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top