- Joined
- 1 Apr 2016
- Messages
- 13,424
- Reaction score
- 540
- Country
The walls of the kitchen were stripped back to brick then plasterboard secured and then plaster which was done on Saturday and its still not dry.
So how long should it take? I have to delay the kitchen fitters as the walls need to be painted but didnt think it would take this long to dry.
So how long should it take? I have to delay the kitchen fitters as the walls need to be painted but didnt think it would take this long to dry.