Morning
i am having ceiling replaced with new plasterboard after some water damage, we have 3 ceilings to come down tounge and grove on top of plasterboard on top of laff and plater, over the years this looks like it has lowered the ceiling by 150MM so finally got the chance to rip it all down before new kitchen arrives and re position some downlights
my question is how long will i need to wait before cutting new holes for the lights
Thanks
Brett
i am having ceiling replaced with new plasterboard after some water damage, we have 3 ceilings to come down tounge and grove on top of plasterboard on top of laff and plater, over the years this looks like it has lowered the ceiling by 150MM so finally got the chance to rip it all down before new kitchen arrives and re position some downlights
my question is how long will i need to wait before cutting new holes for the lights
Thanks
Brett