- Joined
- 8 Feb 2016
- Messages
- 17
- Reaction score
- 0
- Country
I am just about to take delivery of a large piece of limestone, it has been cut to provide a completely flat base. It's going to be within falling distance of a window so I need to make sure it's a stable as possible. Have a look at the photos, the stones dimensions are; Height - 3ft 4” , Width - 2ft, Depth - 12”.
I have laid 2 level paving slabs under the weed membrane. Should I just sit it on those, or should I have another bed of mortar?
Thanks in advance
I have laid 2 level paving slabs under the weed membrane. Should I just sit it on those, or should I have another bed of mortar?
Thanks in advance