We decided to dig up our existing ground floor so we could have underfloor heating installed and this is what the builder did - also plays by local building inspector.
Excavate the floor to a depth to accommodate the following
1) Compacted scallping to a depth of 75mm
2) Sand blinding.
3) Overlay with Black DPM at the required thickness
4) 150 mm rigid celotex or similar insulation board.
5) Boards taped with silver insulation tape. Boards laid staggered.
6) 25 mm external perimeter insulation to reduce cold bridging and assist expansion
7) All boards and up stands overlaid with plastic membrane to protect the insulation from the concrete.
7) Lay underfloor pipe.
8) Overfill with liquid self compacting top flow concrete containing metal fibres to assist with the underfloor heating. Lay at a depth of 100mm.
Concrete sprayed to assist the initial curing.
Our house was built in the 60’s and traditionally with cavity walls.
It’s been over 6 months and we didn’t put the heating on for over 3 month.
We haven’t put the final floor covering down yet but we’ve had cracking and when walking it does sound ‘hollow’ and like there’s vibrations (not sure I’m over thinking it)
Is this going to be an issue? Should we of had 100mm slab below the insulation?
Excavate the floor to a depth to accommodate the following
1) Compacted scallping to a depth of 75mm
2) Sand blinding.
3) Overlay with Black DPM at the required thickness
4) 150 mm rigid celotex or similar insulation board.
5) Boards taped with silver insulation tape. Boards laid staggered.
6) 25 mm external perimeter insulation to reduce cold bridging and assist expansion
7) All boards and up stands overlaid with plastic membrane to protect the insulation from the concrete.
7) Lay underfloor pipe.
8) Overfill with liquid self compacting top flow concrete containing metal fibres to assist with the underfloor heating. Lay at a depth of 100mm.
Concrete sprayed to assist the initial curing.
Our house was built in the 60’s and traditionally with cavity walls.
It’s been over 6 months and we didn’t put the heating on for over 3 month.
We haven’t put the final floor covering down yet but we’ve had cracking and when walking it does sound ‘hollow’ and like there’s vibrations (not sure I’m over thinking it)
Is this going to be an issue? Should we of had 100mm slab below the insulation?