can anyone tell me with regards to a radial circuit which will have IT equipment on it, what do you do with the last socket regarding the cpc, obviously on a ring all sockets will have 2 separate cpc's to terminate in separate earting terminals, but what about the last socket on a radial. Is it just a case of linking them.
also im struggling to find out the correct procedure when it comes to earthing galv steel back boxes. if there is a fixed lug on the back box, is a link between socket and back box not required? Struggling to find anything in the regs
cheers
also im struggling to find out the correct procedure when it comes to earthing galv steel back boxes. if there is a fixed lug on the back box, is a link between socket and back box not required? Struggling to find anything in the regs
cheers