Just not getting this RF2 pack 3 idea

Joined
10 Jul 2004
Messages
14,710
Reaction score
4,340
Country
United Kingdom
http://www.uk-plumbing.com/brochure/honeywell/Pack3Install.pdf

Most older fully pumped houses have the boiler, fused spur and prog at the boiler downstairs, the pump and motorized "heating valve" upstairs in the airing cupboard, sooooo, there is only a SWL to the pump N E and live the the valve running from downstairs, so that is 4 core, to change to an S plan with two valves means 5 cores to the airing cupboard, so the Honeywell Rf pack isn't any help, am I missing something here ? because if it already had 2 mot valves the wiring would already be there, so I don't see the benefit of the RF room and cyl stat !
 
Sponsored Links
Used one where converting from gravity to fully pumped, System boiler in cellar, cylinder in airing cupboard first floor. Whole house done up ceramic tiles etc. Worked a treat.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top