Hi, just layed a row of granite paving to find the mortar hasnt bonded to the slabs. Initial checks mentioned making the backside of the slab moist (watered), upon further reviews it appears a SBR slurry mix is required (bond bridge).
With slabs now back up, would it be ok to just use the slurry mix on top of the original mortar, or renew??