I am laying a new oak parquet floor over the kitchen floor which is sloped at 1.5 to 2 inches deep. I need 1 inch only for the parquet.
The floor is moist.
Should i install a surface DPM and then use a self leveling water based compound ....
or do i need to
first put down a sand and cement base to level floor to 1.5 inch and then do the above?
Thanks!