In the coming days I'll be laying riven slabs 600x600 on a dry sub base mix of 6:1 sharp sand and cement
Should i butt each slab up? or have a mortar joint? Is one method better than the other? Or is it down to personal preference?
If going with a mortar joint, what is the recommended spacing?
Cheers
Should i butt each slab up? or have a mortar joint? Is one method better than the other? Or is it down to personal preference?
If going with a mortar joint, what is the recommended spacing?
Cheers