doing a first floor decking balcony and i'm fixing a 5.4m 6x2 timber to face wall, then hanging joists from that to form decking frame.
Question is do i just leave an half inch or so gap between brick and timber using packers or do i need a flashing band to stop rot or damp?
Question is do i just leave an half inch or so gap between brick and timber using packers or do i need a flashing band to stop rot or damp?