Hello All,
I am build a new build next to my existing house, I arranged for a corgi fitter to fit a boiler and pipe work. The engineer said that he would run push-fit piping within the screed on the ground floor. Since then the boiler has been losing pressure and very 48 hours. Their is a bit of a wet patch near the front door however there was no pipe work within this area, so cant understand why? what is the best option to resolve this matter? Any ideas?
I am build a new build next to my existing house, I arranged for a corgi fitter to fit a boiler and pipe work. The engineer said that he would run push-fit piping within the screed on the ground floor. Since then the boiler has been losing pressure and very 48 hours. Their is a bit of a wet patch near the front door however there was no pipe work within this area, so cant understand why? what is the best option to resolve this matter? Any ideas?