do meter tails for a 70KVA supply have to be 25 or 35mm? works out at 101A per phase
 
25mm would be acceptable over a short run but speak to your leccy provider about what they require for the supply they are planning to install.

also if the 70Kva is agreed max demand the fuse rating could be quite a bit higher and this should be considered when selecting the tails.
 