Mira Sport Max 10.8KW

RossR,

This is a photo of the shower-room. Sorry it's on its side. please rotate clockwise in your head. I have marked position of the shower and pullcord position.

http://www.diynot.com/network/markspark101/albums/8063/31432

The wire above the CU is not connected. It was a possible feed to a wall light in the kitchen next door. This is a separate boiler/ meter/ CU room about 4ft square.

The green circle I think you refer to is a small sticker on previously added new RCD for a new kitchen ring. It's not a button.

The shower is completely separate from everything else - other than the feed.

Mark. - and bye the way thanks for taking an interest in this.
 
The old position of the pullcord might be OK. It depends how high the ceiling is above floor level. The zones in a bath/shower room only extend up to 2.25m. It's OK for the actual cord to be inside a zone, so long as the body of the switch is outside it. Hence my question about the ceiling height.

Of course, there is nothing stopping you from doing more than the regs require.
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top