I'm currently obtaining quotes for the above. I've asked the two companies whom I have already had quotes from how deep they would dig to do the prep. work, and have had quite a difference in their responses.
One said about 200 - 300 mm.
The other said about 600mm.
I realise that the depth will vary from job to job, but roughly what's the minimum depth that should be dug out to give a solid base to lay monblocks.
Cheers