I am using mortar to set blocks on to MOT Type 1. I was wondering how long I need to leave this before I start building a timber floor over this. The 5x2 floor joists will be resting across these blocks and I don't want to disturb their level, etc. by going too soon.
Thanks in advance.
Thanks in advance.
