Hi,
I am intending to lay a couple of concrete slabs in my back garden.
I will be barrowing the MOT and ballast from dumpy bags in the front garden, to the read of the back garden. I'll be doing so over the course of a few days. I'll be mixing with a Belle Minimix.
The MOT I will likely just put directly down in the slab location, but with the ballast I want to stage it on the site, so then have everything ready to mix and pour.
I can either transfer the ballast to some spare dumpy bags I have, or I can just pile it up on some tarp.
The only thing that I wanted to check was whether doing it that way would introduce any risk of the ballast settling and unblending itself in such a way that might affect the concrete mix. I think that is highly unlikely, but just wanted to check.
Although, in this case, I will be adding the MOT directly to the slab base, rather than staging it, it would be useful to know whether there would be any similar risk of unblending of the different sizes of stones in the MOT, that would then be difficult to rectify.
Also, if there are any other problems with doing it this way, I would greatly appreciate any input.
Thanks
I am intending to lay a couple of concrete slabs in my back garden.
I will be barrowing the MOT and ballast from dumpy bags in the front garden, to the read of the back garden. I'll be doing so over the course of a few days. I'll be mixing with a Belle Minimix.
The MOT I will likely just put directly down in the slab location, but with the ballast I want to stage it on the site, so then have everything ready to mix and pour.
I can either transfer the ballast to some spare dumpy bags I have, or I can just pile it up on some tarp.
The only thing that I wanted to check was whether doing it that way would introduce any risk of the ballast settling and unblending itself in such a way that might affect the concrete mix. I think that is highly unlikely, but just wanted to check.
Although, in this case, I will be adding the MOT directly to the slab base, rather than staging it, it would be useful to know whether there would be any similar risk of unblending of the different sizes of stones in the MOT, that would then be difficult to rectify.
Also, if there are any other problems with doing it this way, I would greatly appreciate any input.
Thanks