Hello,
My bathroom is looking a little tatty and I ain't got loads of money to spend on the project. We didn't do it too long ago (about 6 years) but the tiles around the shower have gone mouldy on the grouting. I also want to tile the floor with something nice. At the moment we have 3/4 plywood down on the floor with those sticky back floor tiles down.
Should I take the floor tiles up before tiling?
Should I unscrew the toilet and tile under it rather than cut the tiles?
The room is only about 6ft by 6ft, where do you start to tile from?
Thanks.
My bathroom is looking a little tatty and I ain't got loads of money to spend on the project. We didn't do it too long ago (about 6 years) but the tiles around the shower have gone mouldy on the grouting. I also want to tile the floor with something nice. At the moment we have 3/4 plywood down on the floor with those sticky back floor tiles down.
Should I take the floor tiles up before tiling?
Should I unscrew the toilet and tile under it rather than cut the tiles?
The room is only about 6ft by 6ft, where do you start to tile from?
Thanks.