Hi, I'm just starting to fit a new bathroom, everything's out, I'm fitting a pvc ceiling, new bath sink and toilet and re tiling the walls and floor. My question is, what should be done first?

I was thinking in this order:
-Fit the battons for the ceiling and run the cables for the shower and light
-Put the bath in place and mark the top
-Remove bath and fit batton to wall (for extra support)
-Tile walls up to the new ceiling support
-Install PVC ceiling, lights and extractor
-Tile the floor
-Fit bath toilet and sink

Is there a better order to do things? And i assume the tiles should be slightly lower than the top of the bath?

Thanks in advance,
Mike
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top