Hiya guys
I'm looking at replacing my current metal shed (office) with a new Breeze Block office, 3.5m x 3.0
I have worked it out to be roughly 300 blocks needed, 1.8 to eaves and 2.2m to ridge?
What I'm wondering is the founds..
Do I need anything seriously heavy? Would 2 / 3" thick concrete be more than enough as the ground is quiet solid anyway? or MUST it be 1ft of hardcore etc and 1 or 2 blocks below ground?
I was thinking of just 3" concrete with polythene underneath, then start building on it once set?
I have a tight budget of around £800 / £1000 max
I assume rafters would be set at 600mm?
Cheers
I'm looking at replacing my current metal shed (office) with a new Breeze Block office, 3.5m x 3.0
I have worked it out to be roughly 300 blocks needed, 1.8 to eaves and 2.2m to ridge?
What I'm wondering is the founds..
Do I need anything seriously heavy? Would 2 / 3" thick concrete be more than enough as the ground is quiet solid anyway? or MUST it be 1ft of hardcore etc and 1 or 2 blocks below ground?
I was thinking of just 3" concrete with polythene underneath, then start building on it once set?
I have a tight budget of around £800 / £1000 max
I assume rafters would be set at 600mm?
Cheers