new screed tiling UFH wetroom

Joined
24 Dec 2014
Messages
3
Reaction score
0
Location
London
Country
United Kingdom
Hi made a mistake by laying normal screed 1:4 on wetroom floor (2.5m x 1.5m) with wet UFH pipes in screed. No fibres / mesh/ flexidry etc but waiting 3 mths for 75mm screed to dry is not an option.

I have perimeter expansion insulation in screed layer and can leave gap everywhere but in shower area.

What is risk if I slowly commision UFH and put decoupling sheet and then waterproof matting on top and then slate tiles?

I guess all that prevents tiles from cracking but what is risk with screed not curing and water being trapped under tiling?
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top