Hi everyone.
I have a corner sink that Iwant to move on to the main wall. I'm ok with the waste pvc pipe, but how do I cut back the copper piping to allow new compression joints to be put in place, with out cutting the pipe with water still in it?
Sorry for the noddy question!
I have a corner sink that Iwant to move on to the main wall. I'm ok with the waste pvc pipe, but how do I cut back the copper piping to allow new compression joints to be put in place, with out cutting the pipe with water still in it?
Sorry for the noddy question!
