I'm changing a single storey plastic roof for a slate (man made) roof (3600 x 3200mm) with rafters that are approx. 650mm apart. I intended to insert noggins (4x2) at 1200mm points to pick up the internal plasterboard sheets but was advised to put them at 600mm intervals to avoid plasterboard sag. Is this correct.
Will it make a difference if I put in 2x2 noggins at the 600 and 1800 points?