People,
I have brushed on this point before but some investigation has revealed something with which I could do with some more advice.
Next week I have an electrician coming in to fit a CU.
I have been examining the existing bathroom bonding in my house and have identified that there is a 4mm earth cable running from my MET to one pipe feeding a bath tap. There was then a 4mm that appears to have previously linked the two bath taps but has been removed from one pipe by a previous owner.
Please advise if (as stated in previous questions) I should run 4mm from bathroom radiator, to bath taps and basin taps and then connected to the lighting earth?
Is there any requiredment for the existing 4mm cable that runs from one bath tap to the MET?
I have brushed on this point before but some investigation has revealed something with which I could do with some more advice.
Next week I have an electrician coming in to fit a CU.
I have been examining the existing bathroom bonding in my house and have identified that there is a 4mm earth cable running from my MET to one pipe feeding a bath tap. There was then a 4mm that appears to have previously linked the two bath taps but has been removed from one pipe by a previous owner.
Please advise if (as stated in previous questions) I should run 4mm from bathroom radiator, to bath taps and basin taps and then connected to the lighting earth?
Is there any requiredment for the existing 4mm cable that runs from one bath tap to the MET?