hi i wonder if someone could help me
i have a gronund floor flat with concrete ceileng and a concrete supporting wall that i need to put a 4 ft door way into, i have had the S.E round and he has done all his calcs, but i'm a bit vague on the process of install of a RSJ ie where do i put the acro, do i cut the hole for the lintel then cut my door way or do both at same time, should the RSJ be spaced above the door way or be the top of the door way any help would be appreciated
many thanks Ray
i have a gronund floor flat with concrete ceileng and a concrete supporting wall that i need to put a 4 ft door way into, i have had the S.E round and he has done all his calcs, but i'm a bit vague on the process of install of a RSJ ie where do i put the acro, do i cut the hole for the lintel then cut my door way or do both at same time, should the RSJ be spaced above the door way or be the top of the door way any help would be appreciated
many thanks Ray