Overlay floor insulation

At a technical level;, where you are concerned with getting the old boards out we found with a wide room the best way was to circular saw the floor down the middle, then each have a lump hammer and whack the boards up, remove the remaining nails from boards and joists and move onto the next (First 2 or 3 boards needed lifting with pry bars). A large room took 2 hours, and then a clean t-shirt from the sweat. Not complex work though. Insulating and foaming took about 6 hours, taping took about 1/2 an hour. The next day took 3 hours to get the ply cut and fitted, and then 3 hours to fit laminate and 1 1/2 hours to fit new skirting. Furniture went back in the next day.
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top