- Joined
- 28 Sep 2016
- Messages
- 70
- Reaction score
- 0
- Country
Hey everyone
Hopefully someone can help me out with my sub flooring concerns.
I have brought 3000 parquet blocks and painfull attempted to remove the bitumen off them last week! After 3 days and some 250 blocks down my fingers felt like they had fallen off so I gave up! I'm now into the process of just taking the backs off using my bench saw taking of around 2mm of tile which is giving me a very clean backing But I think the neighbours hate me right now lol
Anyway onto sub floor I'm parqueting 2 rooms first is 2x3msq and second is 3x4msq the latter is around 4-5mm lower than the first room both rooms are concrete.
My plan is to plywood the larger floor to bring it up level with the smaller
My questions are
1, what DPM should I put down on both concrete flooring
2, what should I use to stick the ply down? Is ply the best method
3, any recommendations on parquet glue
Cheers
Hopefully someone can help me out with my sub flooring concerns.
I have brought 3000 parquet blocks and painfull attempted to remove the bitumen off them last week! After 3 days and some 250 blocks down my fingers felt like they had fallen off so I gave up! I'm now into the process of just taking the backs off using my bench saw taking of around 2mm of tile which is giving me a very clean backing But I think the neighbours hate me right now lol
Anyway onto sub floor I'm parqueting 2 rooms first is 2x3msq and second is 3x4msq the latter is around 4-5mm lower than the first room both rooms are concrete.
My plan is to plywood the larger floor to bring it up level with the smaller
My questions are
1, what DPM should I put down on both concrete flooring
2, what should I use to stick the ply down? Is ply the best method
3, any recommendations on parquet glue
Cheers