i was wondering if i could get some advice.
Ive just removed my chimney breast from the ground into the loft.
Most of the party wall brick work is flush but the last 2 meters just under the upstairs ceiling drops back 50/60mm.
Would i be able to use bonding to build this out. Perhaps in 2 coats?
This wall is to be tiled afterwards as its going to be a new bathroom. Im unsure if this makes a differents.
Also the wall has still got sut and is still damp from when rain was coming down the chimney. Does the sut need cleaning off and do i need to wait untill the wall had dryed out.
Any help would be appreated.
Tom
Ive just removed my chimney breast from the ground into the loft.
Most of the party wall brick work is flush but the last 2 meters just under the upstairs ceiling drops back 50/60mm.
Would i be able to use bonding to build this out. Perhaps in 2 coats?
This wall is to be tiled afterwards as its going to be a new bathroom. Im unsure if this makes a differents.
Also the wall has still got sut and is still damp from when rain was coming down the chimney. Does the sut need cleaning off and do i need to wait untill the wall had dryed out.
Any help would be appreated.
Tom
