Hi,
Just wanted to gauge opinion here before taking legal action. I commisisoned a company to prepare a shed base recently, 18ft x 14ft which was done with 2x2 slabs.
The area was fairly flat to start with and they did some raking to level it off. Then, with no other preparation, the slabs were laid on bare soil using dot and dab - blob of cement in the middle of each and blobs to the corners. Nothing else was done and that's how it was left.
Thoughts? Total bodge job? The final product is largely flat but just wondering how bad it will get in the future?
Thanks!
Ted
Just wanted to gauge opinion here before taking legal action. I commisisoned a company to prepare a shed base recently, 18ft x 14ft which was done with 2x2 slabs.
The area was fairly flat to start with and they did some raking to level it off. Then, with no other preparation, the slabs were laid on bare soil using dot and dab - blob of cement in the middle of each and blobs to the corners. Nothing else was done and that's how it was left.
Thoughts? Total bodge job? The final product is largely flat but just wondering how bad it will get in the future?
Thanks!
Ted