hi i am having an extention built and i am ready to plasterboard the ceiling the problem is that my windows and patio doors have been delayed so i am left with openings. would it be alright to plasterboard the ceiling without these going in or would the plasterboard get damp and ruin. this is a single storey extention. any advice would be great thanks.
