Got on site today to hang a boiler on a newly platered wall, but when I checked, the plaster hadn't cured fully and felt tacky.
The plasterer insisted that he had finished it about 24 hours ago, and that it was due to rainy whether.
It looked like the normal reddish bonding stuff, which I have used myself often enough but never needed 24 hours.
Is he talking bollokz or can it really take this long? I wasn't best pleased as I couldn't work and had nothing else booked for the day since I expected to be there until evening.