Plaster 'up to' cement board/tiles or plaster all befor tiling?

Joined
27 Sep 2019
Messages
20
Reaction score
0
Country
United Kingdom
Hi,
I have a dividing metal stud wall along one side of my new bathroom. One small section of it will be in a walk in shower so I'm cement boarding and tiling that area, but the remainder of the wall (divided by the vertical line of the shower screen) will be moisture resistant plasterboard, plastered and painted (not plastered by me).

Should I plaster up to the tile edge once the tiling is finished, or plaster the whole wall then tile the shower section? Or something else?

Thanks!
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top