Hi,
I have had a kitchen/bedroom extension built and I am just get prices for the plumbing work. I have been asked by my plumber if I want copper or plastic pipe - which is the best and which is the most expensive - I assume copper?. I want the CH extended into the new bedroom/ensuite and the MainsW moved in the kitchen and also fed into the ensuite. HW also has to be piped into the ensuite.
I require a new radiator in the bedroom and a towel rail in the ensuite. I also require two plinth heaters in the new kitchen. I also want the shower/sink and toliet plumbed in. I have been quoted £3000 as worst case - does this sound high? - I know you cant tell without looking but just as a ball park figure.
I have had a kitchen/bedroom extension built and I am just get prices for the plumbing work. I have been asked by my plumber if I want copper or plastic pipe - which is the best and which is the most expensive - I assume copper?. I want the CH extended into the new bedroom/ensuite and the MainsW moved in the kitchen and also fed into the ensuite. HW also has to be piped into the ensuite.
I require a new radiator in the bedroom and a towel rail in the ensuite. I also require two plinth heaters in the new kitchen. I also want the shower/sink and toliet plumbed in. I have been quoted £3000 as worst case - does this sound high? - I know you cant tell without looking but just as a ball park figure.