Hi guys, not sure if this is in the right section so here goes, I’m about to lay the ridge on my roof, the instructions on the plasticiser bottle are referring to using 25kg of cement but there’s no way I’m going to use that much cement on a 5 meter ridge!!! Is there another way to measure this ratio? ( please don’t say use a dry ridge as that’s what I’m removing)…
