I am self managing/ labouring my way through a huge ground floor extension. I have a concrete floor about 50mm below my required finished level. Could someone just outline what I need to be aware of if running my first fix radiator copper pipes along this floor and can I just screed straight over the top or do they need to be covered in some way?
thx
thx