hi thanks for your replies it wasnt a wind up i ran out of materials which i couldnt get delivered untill the saturday the local builders yard worked out what i needed but were out with their calculations is their anyway out of this
An easy way would be to lay 25mm thick paving slabs on top of the concrete base at the structural load points of the shed; leaving a gap between slabs will allow the air to circulate underneath the shed drying it out quicker and increasing its longativity. Or as mentioned in other post use 25mm thick treated timber.
If you run short of materials in future, shutter off a section of the floor and finish part of the floor to the correct height. You can then do the other section later.
If you need to find a tradesperson to get your job done, please try our local search below,
or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Please select a service and enter a location to continue...
Are you a trade or supplier? You can create your listing free at DIYnot Local